
Description
FIELD SERVICES:
• Formation of Ovation structure / Architecture
• Ovation system loading and re-loading at site and network troubleshooting
• Locate, differentiate, and analyze the problems arising in design of logic
• Locate, differentiate, and analyze the problems arising from field, hardware errors and DCS
• Perform and Maintain protocols for loop check, device check and panel charging • Loop and device checking and necessary modifications in the logics, graphics and database as per Customer /site requirements
• DCS erection supervision and commissioning at site
• Establish DCS Network and configuration
• Work closely with GEC and global Emerson support team for troubleshooting
• Troubleshooting of DCS HW (e.g. Controllers, I/O Modules, DBS, OWS, EWS etc.)
• Configuration/troubleshooting of Historian, AMS and Advance Algorithms
• Perform third party communication e.g. ELC, SLC, Profi bus, SCADA & OPC etc.
• Installation and Configuration of Enterprise Database Server (EDS
) • Installation and Configuration of Enterprise Database Server (EDS)
• Regular site updates to customer, front office & GEC.
ADDITIONAL RESPONSIBILITIES:
• Lead site activities independently, if required
• Participation in meetings with customer and front offices
• Prepare daily / weekly reports and MOM as required
PROJECT ENGINEERING:
• Design/Implementation of controls from SAMA /Functional diagrams
• Implementation of graphics from sketches/snapshots
• Creation/modification of Ovation Internal Point Database
• Implementation of Simulation logics for First-Pass Test • Virtual controller setup for testing purpose
• Testing of implemented controls and graphics & troubleshooting while testing
• Follow Department Quality processes and procedures
• Scaling of Open loops & closed loops as per the ranges in the HW database
• Use various Productivity tools such as DBID tool, Audit Tool, Database Productivity Tool, Device builder etc. • Conversion of controls and graphics of Third Party DCS/PLC systems to Ovation
• Third Party Communication
• Support Factory Acceptance Test (FAT) activities
• In-house Ovation Server / Workstation loading
- Upgrade versions of ovation systems
Apply on company website